鼓泡清洗机
- 产品介绍
鼓泡清洗提升机主要由鼓泡清洗机和提升机等组成,如下图所示
|
Order No. |
Name 名称 |
Structure and function 结构和功能 |
|
1 |
Tank and frame 水槽和机架 |
Supporting operation 支撑运转 |
|
2 |
Water pipe 水管 |
Spray water and push the material 喷水,推进物料 |
|
3 |
Air pump 气泵 |
Make bubble制造气泡 |
|
4 |
Water pump 水泵 |
Pump water输送水 |
|
5 |
Air pipe 气管 |
Bubble鼓泡 |
|
6 |
Screen 筛网 |
Filter water过滤水 |
|
7 |
Chain wheel 链轮 |
Transmits power传输动力 |
|
8 |
Bearing with slider 带滑块座轴承 |
Support rotation and tension belt支撑旋转,张紧输送带 |
|
9 |
Chain 链条 |
Transmits power传输动力 |
|
10 |
Reducer motor 减速电机 |
Provide power source提供动力 |
|
11 |
Spray inlet 喷淋进口 |
Get in the clean spray water 洁净喷淋水入口 |
|
12 |
Mesh belt with scraper 刮板输送网带 |
Translate material输送物料 |
|
13 |
Mesh plate 筛框 |
Support material支撑物料 |
2.2 Working Process工作流程
Its brief working process is主要工作流程:
Air bubbles impact the material and suspend it in water. Water pipes spray water to push suspended material forward. Elevator lifts the material to the next equipment.
气泡冲击物料使其悬浮在水中,水管喷水推动悬浮物料使其往提升机输送,提升机提升物料输送至下道设备。
Installation, Commissioning 安装调试
3.1 Mechanical Parts机械部件
设备必须在专业人员的指导下进行安装和调试。
3.1.1 Configuration and installation size
Horizontal installation, the remaining is determined by the sample drawings.
3.1.2Installation Conditions 安装条件
380V three phase power, Capacity>14.5KW Ground lead
0.4Mpa water source
Crane or Bridge Crane
380V 三相, 功率>14.5KW 接地
0.4Mpa 水源
线缆或者桥架
3.1.3Installing debugging program, method and matter needing attention
3.1.3.1 Electrical appliances and frame must have grounding, air pump inlet and outlet must be connected according to the related instruction and marks, not to reverse, air pump screw must be firmly connected;
电器和机架必须有接地,气泵进出口必须按照相关说明和标志连接,不得反转,气泵螺杆必须连接牢固
3.1.3.2 To ensure each air outlet hole air-out normally
确保每个出气孔正常
3.2 Electrical Parts
See the < electric schematic diagram>
Operation
4.1 Important Safe Precautions
a. Check if the electrical part has a good conduction and grounding;
b. Check the adequacy of water supply and the seal in the waterway part;
检查电气部件是否有良好的传导和接地性能
检查供水是否充足,水道部分是否密封;
4.2 Safety Protection, Signs, and Instructions before use and in use
Before use, Check whether the air pump rotation is reversing, it is prohibited to reverse. Check whether the gas pipe joint has a leak.
使用前,检查气泵旋转是否反转,禁止反转。检查气体管接头是否有泄漏。
4.3 Operating Procedures, Methods, Matters need to be noted during the process of starting, operating and stopping.
a. When meeting the accident and needing emergency stop, the emergency stop button can be pushed or turn off the total gate.
当遇到事故并需要紧急停止时,可以按下紧急停止按钮或关闭总门。
b. Ensure the machine is powered off, verifying all switches are closed after the machine is shut down.
确保机器断电,验证机器关闭后所有开关都已关闭。
Analysis and Remove Troubles
|
|
Trouble phenomenon |
Analysis of Causes |
Elimination Methods |
|
Elevator Intermittence moving 网带输送卡顿 |
Drive chain relaxation 传动链松弛 |
Check the tension of chain 检测链条的张紧度 |
|
|
Mesh belt Relaxation 网带松弛 |
Check the tension of mesh belt 检测网带的张紧度 |
||
|
Bearing break down 滚筒支撑轴承出现故障 |
Check whether the bearing is in good condition 检查滚筒支撑轴承是否状况良好 |
||
|
2 |
The spray pipe get no water 喷淋管不出水 |
喷嘴堵塞 |
Check whether the spray hole is blocked up 检测喷嘴是否堵塞 |
|
Water inlet valve close 进水阀关闭 |
Check whether the water inlet valve is closed 检测进水阀是否关闭 |
||
|
3 |
Material cannot move forward 物料不往前输送 |
Bubbling stop 鼓泡不工作 |
Check whether the air pump is working; check the connection of air pipes 检测气泵是否工作以及气管的连接 |
|
Water spraying stop 喷水不工作 |
Check whether the water pump is working; check water inlet valve close or not 检测水泵是否工作以及进水阀是否关闭 |
上一个: 去核机
下一个:高剪切乳化罐






